With my new B-hyve irrigation unit, I have watering set for zone 1 20mins, then zone 2 40mins for every 2 days.
When watering is finished, the calendar tab shows zone 1 ran 20mins as programmed, but zone 2 ran 0mins.
Zone 2 did run 40 mins, as programmed. Anyone else seeing this type of calendar error?