Forum Replies Created

Viewing 1 post (of 1 total)
  • Author
    Posts
  • in reply to: Can I use SmartWatering to work over several days? #3895
    ChrisPlak
    Participant

    That would be a way in which I can alter the length, that is not what I want to do. What I want to alter is either the start day or the window of time in which it is allowed to start. Or maybe some option that says “smartwatering group A”, “smartwatering group B”, and each group defines a day of the week or window of time in which it can run. I think the best is if the app automatically realize that it cannot complete within the time window and schedules itself over multiple days to start.

    Spread the love!
Viewing 1 post (of 1 total)